Home Contact
 
4500 SF
 
Up
Western Dynamics
TC Test Conoco Wendy's
United Power
7100 SF
7300 SF
2900 SF
Stapleton Elementary
3400 SF
3600 SF
Monkey Building
Major Geothermal Building
12200 SF
3200 SF
11500 SF Residence
Observatory
Flemming Elementary
Pool Area
12000 SF
Conoco Wendys
12000 SF
TC Test Stapleton
TC Test Delta
TC Test Air Force
Pool Dehumidification
7000 SF
3050 SF
3000 SF
4500 SF
8000 SF
8001 SF
8002 SF
10000 SF
Pool
Boulder Shelter
 
 
 
 

 
 

4,500 sf home, east of Fort Collins, Colorado – Installed by Air Comfort (970-490-1458), their first GSHP system, for a new construction residential project.  Three forced air units with desuperheaters, tied to a common horizontal pit loop.  Completed in spring of 2003. 

System designed and spec’d by Major Geothermal, MG also provided on-site training and supervision to assist Air Comfort for a successful, trouble-free installation.  Air Comfort’s key personnel have all been through IGHSPA installer training provided by Major Geothermal. 

Features :

4500 Square Foot

Horizontal Pit Loop

Three Forced Air Units with Desuperheaters

horizontal rule

.

horizontal rule

 

 
 

Back Next
 
Copyright 2004 [Major Geothermal. All rights reserved